Pages

Friday, 7 November 2008

There is a tremendous amount of detail work involved in getting a new canoe to the point where the canvas can go on, but canvassing is always a most dramatic stage. The canoe really looks transformed with its skin on.

I won't go into all the details of how to canvas as that's technical information that is pretty widely available.


There is still a plywood panel that goes over the canvas flaps on the transom.

The filler is also on now, 2 coats and hand rubbed to a smooth finish. The filler is a mix of silica, linseed oil, enamel, thinner, and a few other things. It takes at least 2 weeks, sometimes longer, to fully cure into a rock hard base for the paint. A builder can use other fillers, but each has its balance of advantages and disadvantages.



While the filler cures, it gives me time to prepare the outwales, keel, and seats. In a few days, the filler will be cured enough for me to start getting the trim installed. By the time that I get the trim sanded and varnished, the filler should be ready for paint. Then the canoe will complete and ready to go!

No comments:

Post a Comment