Pages

Friday, 22 June 2012

Now that I am back fro Fort Severn, I can return to finishing work that I had left.  The Tremblay canoe has received 37 rib end repairs, a bunch of back side rib repairs, new planking all along the sheer line,, gunnel ends, stem ends, deck, outer gunnels, canvas, and fill.  The owner will be doing all of the sanding and finishing.

 
 
 
Posted by Picasa

No comments:

Post a Comment