After the giant job of getting the old freighter canoe rejuvenated, it is refreshing to have canoes in the shop that are in reasonable condition. Currently I have a 16' Huron that has just had two refresher coats of varnish applied to the interior and a 15' Chestnut "Bob's Special" about to be opened up for the same treatment. Shortly they will both be re-canvassed, filled, painted, etc. The Huron is waiting a bit as the planking dried and shrank slightly while in the shop, I put it outside in the humid fall air to swell up a bit before I applied the linseed oil on the outside of the hull.
Also seen is the "S" shaped coffee table that I am working on for my recroom. I've been building the paint finish, it is now ready for final hand sanding and edge veneer, then I'll varnish over everything. I am still in negotiations with my wife about cutting down these fine period table legs to coffee table height. They came from an old end table that she still has some sentimental attchment to.
Also seen is the "S" shaped coffee table that I am working on for my recroom. I've been building the paint finish, it is now ready for final hand sanding and edge veneer, then I'll varnish over everything. I am still in negotiations with my wife about cutting down these fine period table legs to coffee table height. They came from an old end table that she still has some sentimental attchment to.
No comments:
Post a Comment